This Sliding Bar can be switched on or off in theme options, and can take any widget you throw at it or even fill it with your custom HTML Code. Its perfect for grabbing the attention of your viewers. Choose between 1, 2, 3 or 4 columns, set the background color, widget divider color, activate transparency, a top border or fully disable it on desktop and mobile.

This Is A Custom Widget

This Sliding Bar can be switched on or off in theme options, and can take any widget you throw at it or even fill it with your custom HTML Code. Its perfect for grabbing the attention of your viewers. Choose between 1, 2, 3 or 4 columns, set the background color, widget divider color, activate transparency, a top border or fully disable it on desktop and mobile.

Data Cabling

/Data Cabling

Special Olympics Texas

, ,

Special Olympics Texas hired Premier DataCom to install full low voltage systems including a Cat 6 cabling system, security camera, and access control.  Special Olympics Texas required over 200 Cat 6 cabling drops, full MDF building including mounting racks, ladder racks, and suspension.  Exterior and interior cameras were installed, and full access control to include […]

Timberline 1 Cat 5e Cabling System

Timberline had just moved into a new office space and need a new cabling system to replace the existing outdated analog lines in their office space. Premier installed a new Cat 5e cabling system per their specifications.

Alchemy Systems

,

Alchemy Systems required a full network consultation and design for the office network.  Over 400 Category 6 cable drops and fiber installed among 2 separate IDFs..  Premier also installed all associated racks, cable suspension, hardware, and cable management.

1 foot patch cables were utilized to connect the switch and patch panel to maintain a clean and organized rack.

I-Control

,

I-Control’s initial installation called for an entire network design and build-out for the entire office system.  The pictures portrayed here represent a follow-up project that required a relocation of the entire MDF to the opposite of the wall it was originally located on.

Skyonics

A new branch of Skyonics required a quick installation and turn around of a Cat 6 system to power phones and data on all workstations.

Premier also installed two electrical poles to power the modular workstations and route all data cables.

Tri-Supply

A warehouse installation that required going between both 30 foot warehouse ceilings and an integrated office within the warehouse.  Premier also handled the cabling for all the camera and sound systems.