Project Description

Alchemy Systems required a full network consultation and design for the office network.  Over 400 Category 6 cable drops and fiber installed among 2 separate IDFs..  Premier also installed all associated racks, cable suspension, hardware, and cable management.

1 foot patch cables were utilized to connect the switch and patch panel to maintain a clean and organized rack.